• An assessment was completed over the transport corridor for the road transport of product from the FE1 site to the Port of Geraldton using quad road trains. The assessment concluded the road corridor has no major impediments and can be included in the RAV 10 network with minor improvements. These include signage and the widening of one cattle grid.
  • Athena is continuing engagement with the two Shires to develop a road usage agreement.