Athena has identified high value markets
The Byro Iron Ore Project is strategically located approximately 100km west of the proposed Midwest Iron Ore Railway which is planned to link existing and future iron ore projects in the Mid West Region to the proposed Oakajee deep water bulk shipping port north of Geraldton.
During the September quarter 2010 a DTR analysis was carried out on the samples recovered from the 1800 meter, 17 drill hole Reverse Circulation (RC) program carried out on the magnetic targets on E09/1507. Results confirmed the potential to produce a high-grade magnetite concentrate with super low levels of detrimental impurities.
Learn MoreResource Development and Mining Proposal Work
Programmes of work (PoWs) have been granted for the infill drilling required to raise the resource definition from inferred to indicated and in part measured resource. Approvals include a geotechnical programme to enable definitive pit design. Sample from drilling will also be used for quantitative tailings analysis towards tailing facility design.
More Developments
Announcements
Annual Reports
- Annual Report 2024 2024
- Annual Report 2023 2023
- Annual Report 2022 2022
Annual General Meeting 2023
Stay Informed
Enter your email adress to get news and update in your inbox.
"*" indicates required fields